05/25/22 

UPDATE ON CITY WALK BHAM PROJECT MILESTONES
  • Block A – framework in place for wayfinding signage; panels in civil rights area pending installation
  • Block B – concrete work in skate park finishing next week; doors installed; hardware / fixtures needed in medium station
  • Block C – installing handrails; wayfinding signage and rule signage being installed
  • Block D – working on visitor center- installing doors, finishing HVAC for visitor’s center, structural glass being installed, touch up painting ongoing; 9th avenue concrete to be complete in next couple of weeks
  • Block E – wayfinding signage installation ongoing; landscaping 90% complete- adding mulch and pine straw
  • Block F – wayfinding signage installation ongoing; handrails being installed around stage area; decomposed aggregate being installed; mulch and pine straw needed in landscape areas
  • Block G – small station door installations and fixtures, toilet paper holders, hand dryers, etc.; landscaping on south side of parking lot ongoing
  • Block H – playground equipment installed- pending swings; landscaping going in around pond; fountain installed in pond- pending power; concrete work-filling in previous access points; landscape underway- laying sod